The Project consists of work in two areas. The work at Magnolia Park, located at 1401 Middlebrook Way, Rohnert Park, is described generally as crack repair, resurfacing and restriping of the existing tennis courts.
The work at Sunrise Park, located at 5301 Snyder Lane, Rohnert Park, is described generally as a complete reconstruction of the existing tennis and pickleball courts, including new asphalt courts, site furnishings, fencing and sports court lighting, restriping the existing tennis courts to pickleball, and installation of a storm water bioretention feature.
The Contractor must have a valid California contractor’s license, a Class A license. The Engineer’s estimate for this Project is $2,000,000.
A mandatory prebid conference will be held at 11:00 AM on March 27, 2025 starting at Magnolia Park Tennis Courts located at 1401 Middlebrook Way. After visiting Magnolia Tennis Courts, we will then meet at Sunrise Park, located at 5301 Snyder Lane. Attendance at the prebid conference is mandatory for all prime contractors submitting a bid. For those who have attended the prebid conference, additional site visits can be scheduled if the City is notified twenty-four (24) hours in advance.
A digital copy of the drawings and specifications can be obtained on this webpage. If preferred, a hard copy of the drawings and specifications may be obtained from Draftech for a non-refundable fee. Draftech Blueprinting is located at 1544 Terrace Way, Santa Rosa, CA 95404, phone number 707-578-9442.
To ensure receipts of addendums, any party interested in the Project shall place their contact information with the Associate Engineer, Jason Sampietro, at 707-588-2235/[email protected] and/or [email protected].
Requests for Information (RFI) Due:
In writing to [email protected] and/or [email protected] by:
Wednesday, April 2, 2025 at 5:00 PM
Bids Due:
Tuesday, April 15, 2025 at 2:00 PM
City Hall, 130 Avram Avenue, Rohnert Park, CA 94928