A & B Sections Neighborhood Utility Improvement Project (CIP No. 2015 & 2221)

Project Overview:

The City of Rohnert Park has contracted Team Ghilotti to repair sewer mains, watermains, and pedestrian access ramps in the A&B Sections Neighborhood. The work will include repairing approximately 9,000 feet of sewer main, 2,600 feet of water main, and replacement of 19 pedestrian access ramps. The project will improve the reliability and capacity of our water and sewer system, reduce maintenance costs for the City, and ensure that utility services continue to meet the current and future demands of our residents and business community.



Project Map:

A & B Section Improvements


Project Elements to Consider:

  • Construction begins Late January/Early February 2024
  • Work Hours: Monday through Friday, 8am – 6pm, excluding City holidays.
  • Impacts include temporary single lane closures, temporary no parking, construction related noise, odor and dust.


Project Schedule Updates:

  • The Contractor is currently:
    • Lowering existing street utility lids in preparation for asphalt concrete (AC) paving on sections of streets within the project limits
    • During the month of November, the contractor will be AC paving (weather permitting) sections of streets, including:
      • Burton Avenue, between Adrian Drive and Bernice Avenue
      • Section of Burton Avenue, between Southwest Blvd and Baron Drive
      • Section of Beverly Drive between E. Cotati Avenue and Santa Barbara Avenue
      • Section of Boris Court, south of Santa Barbara Drive
      • Section of Boris Court, south of Southwest Blvd
      • Section of Bonnie Avenue between Santa Barbara Drive and Adrian Drive
      • Section of Bobby Way, south of Santa Barbara Drive
    • Contractor is required to notify residences via door hangers in advance of any work impacting residents on the street and public right-of-way
  • Impacts include temporary road closures, temporary single lane closures, temporary sidewalk closures, temporary no street parking, and construction related noise and dust.


Estimated Time Schedule:

Construction to begin in January 2024 and extend through December 2024


Project Contacts:

Dave Latona, Alpha CM Construction Manager, Consultant with the City of Rohnert Park, 707-337-6768

Joe Moreira, Team Ghilotti General Manager, Contractor, 707-763-8700

Julian De Anda, Project Engineer, City of Rohnert Park, 707-588-3317



Project Contact:

Dave Latona
Construction Manager
City of Rohnert Park
707-337-6768

Joe Moreira
Team Ghilotti General Manager
Contractor
707-763-8700

Julian De Anda
Project Engineer
City of Rohnert Park
707-588-3317