Keiser Avenue Reconstruction - Phase 1 / Project No. 2017-18

The work is described generally as installation of a water main in Snyder Lane and Keiser Avenue, including trench paving to the future intersection of Keiser Avenue and Kerry Road.
  1. Demolition
  2. Pavement grind and overlay
  3. Installation of water main on Snyder Lane and Keiser Avenue, including trench paving
  4. Installation of watermain on existing Crane Creek Bridge
  5. Installation of fire hydrants and appurtenances
  6. Miscellaneous paving including HMA roadway digouts, curb and gutter, and sidewalk.
The Contractor must have a valid California contractor's license, a Class A license. The Engineer’s estimate for this project is $1,300,000.00.

A copy of the drawings and specifications may be obtained from Draftech Blueprinting Inc, 1544 Terrace Way, Santa Rosa, CA  95404 telephone: (707) 578-9442, upon payment of a $70.00 nonrefundable fee, if picked up, or payment of a $100.00 nonrefundable fee, if mailed. 


Bids Due:
Tuesday, June 5, 2018, at 2:00 PM
130 Avram Avenue, Rohnert Park, CA 94928



Bid Documents

Bid Results

Project Contact:

Vanessa Marin Garrett
Civil Engineer
Development Services
Direct Line: (707) 588-2251
Main Phone: (707) 588-2232
Fax: (707) 794-9242
Email: vgarrett@rpcity.org

Social Media